Straight Answers

Frequently Asked Questions About Home Renovations

The questions we answer most often about quotes, costs, permits and living through a renovation in the Greater Toronto Area. If yours is not here, call +1 (647) 920-2463 and we will answer it directly.

Quotes and planning

How we price work, what a quote includes, and what we need from you before it can be accurate.

Is the renovation quote really free?

Yes. The on-site visit and the written, itemized quote are free for projects we are a fit for. There is no charge and no obligation to proceed. If the scope is clearly outside what we do, we will say so on the first call rather than book a visit.

What should a renovation quote include?

A useful quote lists the work included, the materials and allowances, the exclusions, the payment schedule and the expected duration. Allowances should appear as real numbers, not as 'TBD'. Anything unknown — such as what is behind a wall — should be identified as an open item with a plan for pricing it.

Do you provide a fixed price or charge by the hour?

Renovation work is quoted as a project price based on a defined scope. Small repair jobs are often quoted as a flat price per task or a bundled visit rate. Hourly billing is not used for renovation projects because it gives you no way to compare quotes or control the budget.

Small job pricing →

Can I supply my own materials?

Sometimes. We are happy to install customer-supplied fixtures and finishes when they are the correct specification and arrive on time. The trade-off is that delays or defects in supplied materials are not covered by our workmanship, and the schedule may shift if an item arrives late or wrong.

How long does it take to get a quote?

Most quotes are delivered within a few days of the site visit. Larger projects that need drawings, engineering review or several trade estimates take longer. We tell you the expected turnaround at the visit instead of leaving you waiting.

What areas do you quote in?

We are based in Mississauga and work across the Greater Toronto Area. Mississauga, Brampton and Toronto are our core markets; surrounding municipalities are considered project by project. Send the address and we will confirm coverage.

All service areas →

Cost and timelines

Renovation budgets are driven by scope and existing conditions, not by a single square-foot rate.

Why do renovation costs vary so much between quotes?

The most common reason is that the quotes do not describe the same work. One may exclude demolition, permit fees, waterproofing or tile preparation; another may include them. Compare itemized scopes line by line rather than comparing totals. If a quote has no itemization, it is not really comparable.

What is the biggest cost driver in a bathroom renovation?

Whether the layout changes. Moving a drain, adding a niche or relocating a vanity adds plumbing and framing work behind the finished surface. Keeping the fixtures where they are and updating tile, vanity, lighting and fixtures is significantly less expensive.

Bathroom renovation details →

How long does a kitchen renovation take?

Most kitchens take three to six weeks once work starts. Cabinet and countertop lead times often decide the start date, and countertop templating adds a pause between cabinet installation and final plumbing. We schedule around those dependencies rather than compressing them.

Kitchen renovation details →

Can we live in the house during a renovation?

Usually yes. Most projects are phased so that a bathroom and a temporary kitchen remain usable as long as possible. Dust barriers, floor protection and daily cleanup are standard. Full-gut projects or major layout changes may make short periods at home impractical, and we will tell you that before you commit.

Do you require a deposit?

Yes. A deposit secures the schedule and covers initial material orders. The balance is tied to project milestones, with the final payment due after the walkthrough and completion of the deficiency list. The exact schedule is written into the quote.

What happens if the scope changes mid-project?

You get the change in writing — what it is, why it is needed and what it costs — before any additional work proceeds. Nothing is added to the bill without your approval. This is especially important in older homes, where opening a wall can reveal conditions nobody could see beforehand.

Permits, code and insurance

What needs a permit, who applies for it, and how inspections fit into the build.

Which renovations need a building permit in Ontario?

Generally: structural changes, removing or altering a load-bearing wall, new or relocated plumbing, new bathrooms, basement finishing, additions, and most electrical work beyond simple fixture replacement. Cosmetic work such as painting, flooring over a sound subfloor and cabinet refacing usually does not. Requirements differ by municipality, so we confirm with the local authority.

Do you handle the permit application?

Where the permit falls within our scope, yes. We prepare the application, coordinate inspections and make sure framing and rough-in work is inspected before it is covered. If engineering drawings are required, we coordinate with a structural engineer and explain that cost up front.

Are you insured?

Yes — we carry liability insurance, and we can provide a certificate of insurance for condominium boards and property managers who require one before work begins. Ask us for it at the quote stage so approval does not delay the schedule.

Can you remove a load-bearing wall?

Yes, with the right process. A load-bearing removal needs an engineer's review, a properly sized beam or post, and a permit. We assess whether a wall is likely load-bearing during the site visit and coordinate the engineering and inspection work that follows.

Framing and structural work →

During the project

What the worksite looks like, how often you hear from us, and how trades are sequenced.

Who do I talk to during the renovation?

One point of contact for the whole project. You do not have to chase individual trades or repeat the same instruction to different people. Questions, changes and concerns go to the same person from the first visit to the final walkthrough.

How often will I get updates?

You get a schedule at the start, a weekly progress update, and a message whenever something affects the plan — a delayed material, an inspection date or a discovered condition. If there is nothing new, you will not get filler messages, but you will never be left guessing about the next step.

How is dust controlled?

Work areas are sealed with plastic barriers and zipper doors, floors are protected, and sanding is done with dust-controlled equipment where possible. Debris is bagged and removed rather than left in the driveway, and the site is cleaned at the end of each working day.

Can I be away during the work?

Many clients are. We need access to the work area, power and water, and a way to reach you for decisions. If you will be away, we agree in advance on who can approve access and how changes will be confirmed in writing.

What order does the work happen in?

Protection and demolition, framing, plumbing and electrical rough-in, insulation, drywall, taping and mudding, waterproofing and tile, flooring, cabinets and fixtures, painting, then trim and hardware. Following that sequence is what prevents finished surfaces from being damaged by work that should have happened earlier.

The full renovation process →

Service and workmanship

What happens after the last coat of paint, and what is covered once the project is done.

What happens at the final walkthrough?

We walk the project with you, list anything that needs correcting and complete that list before final payment. You also get care instructions for the finishes — tile and grout, natural stone, new hardwood and painted surfaces — so the result holds up.

What if something goes wrong after the project is finished?

Call us. Workmanship issues that relate to how we installed something are addressed directly. Product failures are handled through the manufacturer's warranty, and we help document what is needed to make that claim.

Do you take on small jobs, not just full renovations?

Yes. Trim repairs, drywall patches, caulking, door adjustments, shelf and TV mounting, faucet swaps and similar tasks are handled as small home improvement jobs. Bundling several into one visit is the most efficient way to use that service.

Small home improvement jobs →

Do you work on condominiums?

Yes, in Mississauga, Toronto and elsewhere in the GTA. Condo work needs the building's renovation requirements — work hours, elevator bookings, insurance certificates and sometimes sound-control measures for flooring. Share those with us before scheduling and we will plan around them.

Renovating in Toronto →

Still deciding where to start?

Browse the service directory, read how a project runs, or request a free quote.

Planning a Home Renovation?

Let's discuss your project and find the right renovation solution for your home. Whether it's a kitchen upgrade, bathroom remodel, or a complete interior transformation — BZ Renovation is here to help.